Business coordination software for the electrical industry

Electrifying – BCS in use for companies in the electrical engineering and electronics industry

As the driving force behind innovation in industry, the electrical industry is actively shaping the digital transformation in the five key markets of Industry 4.0, energy, mobility, health, and buildings. Driven by technological progress, the electrical industry is moving faster than many other sectors. Manufacturing companies that do not want to fall behind the competition need an ERP system that is as flexible as the market and the companies themselves. With BCS from Projektron, you can not only plan and control projects in the electrical industry according to your preferred project management method and your individual project guidelines, but also optimize the business processes of your entire company via integrated ERP functions – flexibly on-premises or in the cloud, “Made in Germany.”

I want to try BCS!
GetApp ReviewsGetApp BadgeTrusted Bewertung für BCS, sehr gutCapterra Reviews für BCSOMR Rating Widget für BCSOMR Badge für BCS

What if your project management software...

➤ is flexibly adaptable to your methods, requirements and PM guideline?

➤ creates clear structures and clarity in complex multi-project management?

➤ enables you to react to resource bottlenecks at an early stage?

➤ actively supports you in scheduling and personnel deployment planning?

➤ allows you to record project effort directly on the project?

➤ provides you with reliable target/actual analyses and real-time project data?

➤ is low-effort in installation and maintenance & integrates seamlessly?

➤ provides a comprehensive "toolbox" for project communication? 

➤ manages all your employees, resources, inventory items, suppliers and customers?

➤ makes collaboration with your customers more transparent and effective? 

➤ lets you design your own controlling evaluations and reports?

➤ map the entire order process from quotation to invoicing?

➤ helps you to ensure your process and quality standards on a data basis?

Depending on the project and customer requirements, we develop according to the V-model, Scrum or a mixture of both. Without BCS as a powerful and open-method project management software, the current project flow would not be feasible. Internally, we also maintain a project management manual as a guideline for our project management activities. We have already been able to automate very many of the processes recorded there thanks to BCS.

Jörg Klenke
Management Board | PMO, BURGER ENGINEERING GmbH, Schwaig

With Projektron BCS, we have found a central platform that maps our complex project business in a structured way and is flexible enough to meet our individual requirements. The collaboration with the Projektron team is professional, cooperative, and always solution-oriented. The decision to go with BCS was a milestone in our digital development—it still feels absolutely right today.

Achim Habbel
Managing Partner | Alfha GmbH & Co. KG, Vienna, Austria

  

BCS - Project management software for the electrical industry

BCS has already been named ERP System of the Year several times and has also received the Process Solution Award. The award recognized not only the diverse and method-open project management functions, but above all the focus on process automation and the digitization of business processes. BCS supports your management and your entire company in the electrical industry in controlling internal and external processes efficiently, securely, and largely automatically – GDPR-compliant and “Made in Germany.” The solution can be used flexibly on-premises or in the cloud.

Meet deadlines, reduce costs, create synergies, achieve project and company goals – with BCS as management software in the electrical engineering and electronics industry.

 

Project Management and Resource Planning: Achieving Goals

 

Wizard-supported project planning according to various methods

Project planning according to the critical path method

Visual time and resource planning  in the interactive Gantt chart

Forward-looking resource and personnel planning

Project preparation with risk management and target definition

Multi-project- and portfolio management for full overview

Project controlling: graph. Analyses, earned value analysis, forecasts

Vacation management: resource planning takes absence into account

Time recording: task, customer, project related recording of efforts

 

Efficiency and quality: All processes optimally supported

 

Freely definable workflows and processes according to BPMN 2.0

Quality assurance: Templates, checklists, quality gates

Processes and workflows for verification & validation of your products

Processes for planned, standard-compliant development execution

Quotation- and invoice generator with dispatch directly from BCS

Document storage: store design data centrally and securely

Contract management and inventory management

CRM: contacts & communication (customers, suppliers etc.)

Qualitative & quantitative evaluation measures for goals freely definable

 

Ticket system - teamwork, task assignment, customer support

 

Web-based software: location-independent collaboration

Internal tickets: task allocation, change requests and much more

Ticket view in Kanban board with drag-and-drop operation

Documented processing and communication history on the ticket

Ticket evaluations individually and according to requirements

Linkable with Scrum elements: Customer ticket becomes user story

Set up individual support portal for your customers in BCS

Guarantee service quality: Transparent service and response times

Record processing times directly on the ticket, simple billing

 

Open methods, flexible and adaptable

 

PRINCE2®, PMI/PMBOK, Scrum, Automotive SPICE®, V-Model etc.

Supports hybrid project management methods

Mapping of your project management guideline and role concept

Fine-grained rights concept according to your organizational structure

Customizable: highly adaptable to your own requirements

Freely designable templates, reports and evaluations

Individual dashboards with personal task overviews

Seamless integration into your existing software environment

Various interfaces (e.g. Jira, SAP, DATEV, Exchange)

Would you like to learn more about BCS as software for the electrical engineering and electronics industry?

Take part in our demo presentation now and start your no-obligation trial – free of charge, of course!

I would like to test BCS!

  

Software Made in GermanyOMR 2026 Top RatedTÜV Rheinland ISO/IEC 27001, 27017, 27018TISAX Result availableSoftware Hosted in Germany 2026Projektron GmbH on Deutschland.Digital

  

Why is BCS the ideal software for the electrical industry?

BCS is the ERP and project management software for companies in the electrical engineering and electronics industry of any kind:

Electrical Engineering Electronics Electrical Equipment Manufacturing    Power Electronics
Mechatronics Systems Engineering Automation Consumer Electronics
Electric Vehicles Electrical Power Engineering Optical Hardware Computer Hardware
Cyber Security      

Why did the managers in the electrical industry choose the project management and business coordination software, and what were their most important selection criteria? To this day, they still rely on BCS, but what were the reasons for this decision?

"If you are not only looking for a powerful project management tool, but also an integrated solution for a wide range of company departments and use cases, you are really in good hands with Projektron BCS. The holistic view in company processes and solutions is commendable, thus isolated solutions are avoided. This positive aspect is complemented by a high level of customizing."

Thomas Hackenbuchner
Head of Finance & Administration, MicroNova AG, Vierkirchen

"BCS supports us in all phases of planning and implementing our projects, enabling us to run smoothly. We can access real-time data and thus manage to keep our project data up-to-date even across locations."

Matthias Winterhalter
Head of Test Engineering VS Europe, Variosystems AG, Steinach, Switzerland

We use BCS software throughout the entire project lifecycle, starting with the pre-project phase, followed by bidding and project processing, and ending with invoicing. In project processing, we use different tools in BCS depending on the project complexity. In any case, time or activity recording is a central component in every project. Therefore, we use BCS consistently in all our projects.

Franz Essl
IT Administrator, Best-Tech GmbH, Sierning, Austria

"Our employees now know on a daily basis which tasks are assigned to them. We can see exactly which parts of a project have already been completed and how much budget is still available. In the meantime, we use the Projektron software for our time recording and performance records, project management, resource planning including vacation and sickness management, as well as for invoicing and expense reporting."

Dr. Sven Kleiner
Member of the Board, :em engineering methods AG, Darmstadt

"Projektron BCS emerged as the winner from our selection process because the software was the easiest to use compared to the competitors. We were also convinced by the fact that installation with BCS was self-explanatory, so we didn't need any extensive training."

Uwe Wilhelm
Managing Director, PEAK System Technik GmbH, Darmstadt

"BCS is used today in the entire project management, and in particular in time recording, leave management and in the evaluation of the individual projects. In addition, resource planning and the ability to monitor the entire course of the project at any time are important to us."

Dr. Lutz Jänicke
Product & Solution Security Officer, PHOENIX CONTACT Cyber Security AG, Berlin

"Projektron BCS covers our wide spectrum. Since we have been implementing our project work with BCS, project management is perceived differently in our company. Scheduling, hourly billing, task assignment and team scheduling are just a few important functions that make working together more transparent. In the weekly project manager meeting, BCS has become the measure of all things."

Mirko Wittek
Senior Manager Business Applications and Processes, Leadec Automation & Engineering GmbH, Hoyerswerda

"We no longer wanted to maintain our projects using an Excel list, but instead wanted to map complex project planning with effort, employee deployment and scheduling. Over the years, we have established BCS in various departments and areas of our company and manage cross-departmental project planning. We use the ticket system internally for requests in IT, among other things, and now have a good overview, great tracking and good evaluations."

Nina Belau
Project Management Central Development, Viscom AG, Hannover

  

First-hand experience:

User reports from companies in the electrical industry that have been successful with BCS for years

 

The advantages of BCS as software in the electrical industry

Circuit closed: All information centrally available

To ensure that all components are available at the right time in tightly timed product development cycles and the dynamic development of the entire electrical industry, it is not only the internal organization that is crucial, but above all the complex network of relationships with a network of different suppliers and customers. With Projektron BCS, you make all information available centrally and up-to-date for all stakeholders by creating a perfect image of your internal organization and your external relationships and making any information available at the right place.

 You plan your projects in Projektron BCS according to your individual project management guidelines. BCS supports agile and hybrid methods in addition to classic project management standards (waterfall model, GPM/IPMA, PMI, V model PRINCE2). Once you have created a project, you can save it as a template and use it as a standard for future planning.
 You map your processes in BCS with integrated workflows and checklists or with the BPMN module for business process modeling. You can flexibly define and automate processes for all your project and business activities, for example complex inspection processes, production processes, invoice works, procurement and purchasing processes or even release processes for vacation requests, etc. BCS informs each person responsible for a process step what they have to do and by when.
 You manage your customers, suppliers, service providers and contacts centrally with the CRM function of Projektron BCS. Once created, the communication history for each stakeholder is stored here, and contracts, offers, invoices, documents, data on joint projects and appointments are linked to the respective person or higher-level organization and made centrally accessible.
 Your internal organization is completely mirrored in BCS, both the organizational structure of your company with all locations and the project organization. Employee information is stored in digital personnel files with function, skills, areas of responsibility, departmental affiliation, working time model, payroll information and vacation management and made available for resource planning.
 Your assets, means of production, machines and other inventory items are also recorded in BCS, linked to associated contracts and documents and can thus be scheduled as material resources in projects.
 You centralize your communication with BCS. You can import and record any task in BCS using the mail import and CTI interfaces. With project tickets, you can assign specific tasks and collaborate across locations worldwide thanks to the multi-language capability. All communication of ticket agents and representatives as well as the recording of working hours on tickets flow into the superordinate project. You can use the full functionality of tasks, tickets, workflows with checklists and deadlines in BCS to support the planning of your external project communication. This allows you to plan project communication as an integral part of the entire project from the very beginning. Through the guest licenses, which can be flexibly defined by means of detailed rights assignment, you can include external stakeholders and give them a direct insight into the project progress or even grant them a say regarding certain views and aspects.
 You upload your documents directly to tasks or appointments. Documents are stored in a uniform filing structure so that they can be found again. Authorized employees always have access to relevant information from anywhere. Team collaboration is facilitated because all members have access to the latest document version and changes are traceable. There are no more duplicates or outdated versions of documents. Search and filter functions facilitate knowledge transfer and research.
 Not only do you organize and manage your contracts in BCS, but you get a powerful tool for your entire contract lifecycle management (CLM). Link your contracts to people, organizations, tasks, workflows, project groups, projects, items in your inventory, offers, invoices or other contracts, or integrate them easily into work and approval processes. Use the integrated contract generator to create new contracts according to your individual requirements.
 Projektron BCS can meet your individual requirements in terms of functional scope, mapping of your business logic and corporate language, right through to corporate design, by means of high-level customizing options.

Efficient communication processes and the immediate availability of all relevant information and materials are the keys to keeping development and production costs as low as possible in your company in the electronics industry and reliably meeting deadlines in your product development cycles. Projektron BCS is your central platform on which all this information flows together and is intelligently networked.

"Today, it is impossible to imagine PEAK's work processes without Projektron BCS. When an employee arrives at PEAK in the morning, the first thing he does is take a look at the BCS calendar: Who is there? Which room is occupied? Is the EMC lab free? Or: Is a company car available? From the first moment, the employee has to ask around less. The information is simply there. That saves time and, of course, money."

Uwe Wilhelm
Managing Director, PEAK System Technik GmbH, Darmstadt

"We introduced Projektron BCS for project planning and time recording in our company at the beginning of 2012. We use the project management software to plan our development resources and for multi-project management."

Sönke Paschko
Head of Development, Freyer & Siegel Elektronik GmbH & Co. KG, Mühlenbecker Land

Project management in the spotlight

Projektron BCS is a tool that supports you throughout the entire project lifecycle, regardless of the method or standard used. BCS not only offers support for classic methods such as PRINCE2, GPM/IPMA or PMI as well as agile methods such as Scrum, but also all the necessary tools, functions and wizards to apply hybrid project management methods and industry-specific standards such as V-Scrum. BCS supports you with high flexibility and maximum customizability to map your individual project management requirements.

With the help of BCS you can get informative schedule and deployment plan overviews for research, development, investment projects in the electrical industry. BCS supports project managers in all phases of the project, from initiation and planning to controlling and closing. You can generate project proposals from ideas, compare them, and use BCS' PPM tool to compile project portfolios on different focus areas to decide which projects to implement.

BCS' multi-project controlling helps you keep track of all projects with their current status and resource utilization. With project-specific and cross-project evaluations, you can analyze not only planned and actual values, but also the remaining effort estimated by the individual project teams. The project team documents all efforts continuously and directly on the project and makes them available for invoicing at any time.

Thanks to the effort tracking, BCS is an excellent tool for our PMO to budget both external and internal tasks. It also gives an overview at any time of how much effort goes into which tasks. During the course of the project, employees regularly compare the actual and remaining effort with the planned effort. In this way, any need for action is identified at an early stage and those responsible can seek discussions with the customer to identify the causes of any additional effort and take appropriate countermeasures accordingly.

Jörg Klenke
Management Board | PMO, BURGER ENGINEERING GmbH, Schwaig

Projektron BCS lets the spark fly

Projektron BCS is an ERP and project management software that enables your company's development or production teams in the electrical engineering and electronics industry to collaborate efficiently, regardless of their location. With integrated collaboration tools and central access to projects and documents, the software enables seamless connection of all project participants on one platform.

This collaboration is internationally accessible, as the system supports multiple languages and currencies. This allows teams in different countries to use their preferred language and currency. For example, your German location can work in German and bill in euros, while your development service provider in Budapest can use the Hungarian user interface and currency. Projektron BCS offers a total of ten different language versions.

Your employees can access Projektron BCS from anywhere using a simple browser or the app. Thanks to the appropriate license structure and detailed rights management, not only internal teams from different development and production locations, but also customers and external project staff can be actively involved in the project work. Project participants with the appropriate rights can access the same central database regardless of their location and keep track of tasks, deadlines, and appointments.

Involving your customers creates transparency and keeps them informed about the current status of project work as well as resources, expenses, and costs. Direct communication via BCS can speed up approval processes and lead to trust-based collaboration within the team, which in turn results in time and cost savings for everyone involved.

Ticket system in BCS - Versatile for task assignment and external communication

The ticket system in Projektron BCS opens up several options at once:

 Customer communication and communication with external service providers and project participants
 Internal task allocation and work organization within the scope of project tasks and line activities (Kanban board)
 Flexible task- and project-related effort recording for precise billing
 Exchange and documentation of communication within the scope of collaboration (also across locations)
 Change managementvia open items and tickets in which you escalate releases and changes directly to the steering committee.

Not only can you document your entire communication process on a ticket and attach documents required for processing a task, but you can also directly record the processing effort.

"Projektron BCS makes it easier for us to work with customers, both in the project area and in the support area thanks to the external ticket system. The system is so flexible that we can transition from project business to service/support without much friction. Vacation/FTE planning and also time recording in the same system are a great added value and make our employees' work easier."

Markus Ducke
Service/Support Manager, Thum + Mahr GmbH, Monheim am Rhein

Guarantee quality, create transparency

Quality management: sources of error dry up

With Projektron BCS, you can easily check your quality management through a variety of evaluation options and the use of the ticket system and gain important information, such as identifying frequently occurring product errors. Standardized checklists enable you to map known error sources and efficiently support your employees in improving quality. Projektron BCS offers proven inspection methods at numerous points, such as in projects, tasks, workflow steps and milestones.

Quality management plays an important role, especially for ISO 9001 certified companies, for which Projektron BCS templates, checklists and workflows provide efficient support. The program can be flexibly adapted to your company's processes and workflows.

By documenting the course of the project in Projektron BCS, you can easily and quickly save valuable experiences in the appropriate remark fields. In this way, you can already contribute to well-founded process analyses during project work and promote continuous quality improvement.

"BCS also supports MicroNova in the processes around quality and information security management. In the former area, the company uses BCS to determine quality metrics through the use of raw data. These include compliance with process specifications, budgets and deadlines as well as measuring customer satisfaction, as well as obtaining defined quality gates."

Thomas Hackenbuchner
Head of Finance & Administration, MicroNova AG, Vierkirchen

Product management with BCS

In the "Products" workspace of Projektron BCS, you can organize your products in a hierarchical structure of product structure elements. This hierarchy can be as deep as you like and is visualized by a graphical network diagram. The hierarchy includes related products by predecessor-successor relationships and represents them by hierarchies. In addition, custom relations can be represented. If you click on a product, you can open a detailed view in which the predecessor-successor relationships are even more clearly visible.

Transparent performance: reports

When collaborating with external business partners, your company in the electrical industry benefits from the customizable reports you can create in Projektron BCS: A project preparation report, for example, creates a common project understanding, while effort reports on projects and tickets increase transparency and secure the trust of your clients and customers.

Would you like reports that are precisely tailored to your company? Thanks to the interface to the open source report designer BIRT, you can design completely individual reports. You want to provide your customers with regular reports? You can create project status reports with statements on the current production status, the stability and quality of the project results, risk assessment and deviations from the original planning at the push of a button using the reporting function in BCS. You can do this efficiently using report orders with an integrated e-mail function: In the ergonomic wizard, you create all the required information on the report, output interval and recipient once, and Projektron BCS takes care of everything else for you automatically.

Looking back, we can say that choosing BCS was the right decision for our company. For us as a project-oriented technical service provider, BCS is the optimal tool to successfully implement demanding design and development projects for or together with our customers. Our internal activities and processes are optimally supported and our company's further growth is facilitated.

Franz Essl
IT Administrator, Best-Tech GmbH, Sierning, Austria

"BCS is also important for the project managers, who evaluate the ongoing projects and keep the customers informed about the status. Reporting has become much easier since we started working with BCS. At PEAK, we place particular emphasis on the ticket system and milestones. All of this together leads to much greater transparency for us and for our customers. It has also significantly improved our resource planning."

Uwe Wilhelm
Managing Director, PEAK System Technik GmbH, Darmstadt

Not only during project execution and for internal project controlling BCS provides more transparency, but already during the planning phase towards the customer: Even the first rough planning can be shared with the customer via BCS. In this way, the entire procedure and also the estimated efforts and budgets become more comprehensible for our customers. If a customer also wants regular insight into the status of project progress and bookings during project implementation, this is no problem at all. Particularly with regard to this transparency towards the customer, I can expressly recommend BCS to other companies in our industry for project management.

Jörg Klenke
Management Board | PMO, BURGER ENGINEERING GmbH, Schwaig

Runs by itself and always better: automate and optimize processes

Projektron BCS offers your company in the electrical industry the opportunity to model your individual production, sales and business processes with the BPMN process designer. As an internationally recognized notation standard, BPMN is a central component of business process management and enables you to visualize and optimize your business processes and workflows. Furthermore, it creates more transparency about the processes within your company and towards potential customers.

BPMN processes enable you to assign tasks in a transparent and clearly defined manner in teamwork and in collaboration across departmental boundaries, hierarchical levels and locations.

Typical use cases for BPMN processes are:

 complex verification processes

 invoice workflows

 procurement processes/purchasing processes

 approval processes with approval workflow (vacation request, request for business trip, home office, time off compensation, expense reimbursement, etc.)

Projektron BCS supports business process management with the BPMN Designer, with which you can design, model, execute, monitor, document, evaluate and optimize processes. In the process, often repetitive business processes and workflows can be automated. The BPMN Designer enables every employee to keep track of when they need to complete which task and how they contribute to the overall goal.

With clear processes and structures, BCS provides lasting relief, maximizes the benefits of data maintenance across all process steps, and enables the simultaneous management of multiple clients without switching systems. The integration of external project stakeholders and flexible interfaces—such as those with in-house developments and DATEV—further enhance efficiency and adaptability.

Johannes Korte
Head of Central Services | ADLER Solar GmbH

  

BCS in the SaaS model or via license purchase - you decide!

BCS was developed as a central tool that supports all important work processes from quotation to invoicing in your electrical engineering company with numerous ERP functions – not just project work. It is flexibly scalable and, thanks to a wide range of customization options, offers simple and needs-based integration into your requirements.

BCS has a modular structure, which allows you to put together your individual ERP software for your company in the electrical industry piece by piece. You only pay for the functions you really need and use. Your system remains updatable and flexible, so you can integrate extensions quickly and easily.

Choose freely between the on-premise and the SaaS (coud) Variants of BCS. BCS has been developed and continuously enhanced by Projektron GmbH in Berlin since 2001. You can expect four new releases per year. As a German provider, we host your data in Germany according to the highest data protection and security standards.


"In the BIRT report designer, our project management team - after appropriate training by Projektron - also designed its own project profile and project status report. Furthermore, BURGER ENGINEERING has had additional controlling evaluations programmed by Projektron - for evaluating the rate of paid hours of our employees. In addition, our project management team has created various checklists for the area of occupational safety as well as for the various quality gates in the projects."

Jörg Klenke
Management Board | PMO, BURGER ENGINEERING GmbH, Schwaig

"Personnel planning as well as hourly bookings have been completely transferred from Excel to BCS. Interfaces to our time recording/absence software and to our main ERP system are being planned. Thanks to BCS, we have managed to get a good overview for everyone involved in projects. Our requirements were implemented quickly and conscientiously by Projektron's support team."

Nina Belau
Project Management Central Development, Viscom AG, Hannover

"Before deciding on project management software, we compared various solutions. Projektron BCS proved to be the one that best met our requirements - and offered a very attractive price-performance ratio. With BCS, our internal and external projects can be mapped 100 percent; the software adapted to us, not the other way around."

Dr. Sven Kleiner
Member of the Board, :em engineering methods AG, Darmstadt

BCS was able to convince us with its focus on projects, the best coverage of our requirements, the good price-performance ratio and the modern web interface. After the decision, we planned the implementation together with Projektron. Several joint workshops were held to define the configuration, specify necessary adjustments and plan the transfer of inventory data. Here, we had a competent and committed technical account manager from Projektron at our side, who helped us to set up BCS in the best possible way for our requirements.

Franz Essl
IT Administrator, Best-Tech GmbH, Sierning, Austria

Discover BCS in a non-binding, personalized demo and start your free trial period!

I would like to test BCS!

  


References: These companies from the electrical industry already rely on Projektron BCS

Are you convinced by the use cases and experiences of electrical engineering and electronics companies with BCS?

Then arrange your free demo presentation now and start the trial phase with no obligation.