Like a well-oiled machine – BCS in mechanical engineering

With BCS, you can not only plan and control mechanical engineering projects according to your preferred project management method and your individual project guidelines, but you can also optimize the business processes of your entire company using integrated ERP functions: When should an expensive component be ordered so that it does not sit unnecessarily in stock? Is the implementation period requested by a customer realistic? With BCS, you can plan materials and resources in advance, implement projects of any size on schedule, store your design data centrally, securely, and in compliance with GDPR, and manage your communication with suppliers and customers. The solution can be used flexibly on-premises or in the cloud and is “Made in Germany.” BCS is a well-oiled machine in which every cog meshes with the next.

I want to try BCS!
GetApp ReviewsGetApp BadgeTrusted Bewertung für BCS, sehr gutCapterra Reviews für BCSOMR Rating Widget für BCSOMR Badge für BCS

What if your project management software...

➤ combines all business processes under the umbrella of one tool?

➤ is flexibly adaptable to your methods, requirements, and PM guideline?

➤ manages all your employees, resources, inventory items, suppliers, and customers?

➤ creates clear structures and clarity in complex multi-project management?

➤ enables you to react to resource bottlenecks at an early stage?

➤ actively supports you in scheduling and personnel deployment planning?

➤ allows you to record project effort directly on the project?

➤ maps the entire customer communication from quotation to invoicing?

➤ helps you to continuously optimize your processes and workflows on the basis of data?

➤ automates your reporting?

➤ provides you with reliable target/actual analyses and real-time project data?

➤ is low-effort in installation and maintenance & integrates seamlessly?

Eva Klama
Project Management Office | Hörmann KG Antriebstechnik, Steinhagen

We were looking for a software that could map the approach of our project management guide. With BCS we found a good solution because the software could be flexibly adapted. Today, BCS provides us with a very good overview of our project landscape. Personnel bottlenecks as well as delays in the project are detected very quickly and we can take countermeasures at an early stage. For our project managers, the software is thus a very important tool.

  

BCS - Project management software for mechanical engineering

BCS has already been named ERP System of the Year several times and has also received the Process Solution Award. The award recognized not only the diverse and method-open project management functions, but above all the focus on process automation and the digitization of business processes. BCS supports your management and your entire company in controlling internal and external processes efficiently, securely, and largely automatically—GDPR-compliant and developed in Germany. The solution can be used flexibly on-premises or in the cloud.

Meet deadlines, reduce costs, create synergies, achieve project and company goals — with BCS in mechanical engineering.

 

Project management and resource planning: Achieving goals

 

Wizard-supported project planning according to various methods

Visual time and resource planning in the interactive Gantt chart

Project preparation with risk management and target definition

Multi-project management and portfolio management for full overview

CRM: contacts & communication (customers, suppliers etc.)

Project controlling: analyses, target/actual comparisons, forecasts

Forward-looking resource and personnel scheduling

Vacation management: resource planning takes absences into account

 

Efficiency and quality: All processes optimally supported

 

Quality assurance: Templates, standardized checklists, workflows

Freely definable workflows and processes according to BPMN 2.0

Quotation and invoice generator with dispatch directly from BCS

Document storage: Store design data centrally and securely

Contract management and inventory management

Effort & expense recording task-, customer-, project-related

Qualitative & quantitative evaluation measures for goals freely definable

Ticket system with communication history e.g. for change requests

 

Simply integrated, boundlessly operational

 

Software for access from anywhere, anytime

Numerous collaboration tools: cross-location collaboration

International collaboration: multi-language & multi-currency capabilities

For your customer service: customer support portal via ticket system

Low installation and maintenance effort

Modular structure: Functions can be deactivated individually

Multiple interfaces to common tools (Jira, DATEV, Exchange, etc.)

Can be seamlessly integrated into your existing software environment

 

Open methods, flexible and adaptable

 

PRINCE2, PMI/PMBOK, Scrum, Automotive SPICE, V-Model, etc.

Supports hybrid project management methods

Mapping of your project management guidelines and role concept

Fine-granular rights concept according to your organizational structure

Customizable kanban board with drag-and-drop operation

Customizable: highly adaptable to your own requirements

Freely designable templates reports and evaluations

Individual dashboards with personal task overviews

Would you like to learn more about BCS as software for mechanical and plant engineering?

Take part in our demo presentation now free of charge and start your no-obligation BCS trial!

I would like to test BCS!

  

Software Made in GermanyOMR 2026 Top RatedTÜV Rheinland ISO/IEC 27001, 27017, 27018TISAX Result availableSoftware Hosted in Germany 2026Projektron GmbH on Deutschland.Digital

  

Why is BCS the ideal software for mechanical and plant engineering?

BCS is the ultimate project management software for companies in mechanical and plant engineering of any kind:

Mechanical engineering Plant construction Automotive engineering Drive technology
Special mechanical engineering Electrical engineering Technical services Aerospace engineering
  Measurement and control technology Special machine construction  


What was important to the managers of these mechanical engineering companies when selecting BCS and why do they still rely on the project management, ERP- and business coordination software BCS today?

Franz Essl
IT Administrator | Best-Tech GmbH, Sierning, Austria

We use BCS software throughout the entire project lifecycle, starting with the pre-project phase, followed by bidding and project processing, and ending with invoicing. In project processing, we use different tools in BCS depending on the project complexity. In any case, time or activity recording is a central component in every project. Therefore, we use BCS consistently in all our projects.

Nina Belau
Project Management Central Development | Viscom AG, Hannover

We no longer wanted to maintain our projects using an Excel list, but instead wanted to map complex project planning with effort, employee deployment and scheduling. Over the years, we have established BCS in various departments and areas of our company and manage cross-departmental project planning. We use the ticket system internally for requests in IT, among other things, and now have a good overview, great tracking and good evaluations.

Eva Klama
Project Management Office | Hörmann KG Antriebstechnik, Steinhagen

The flexibility of the software was the decisive factor. Our project management guideline was easily mapped with BCS. For example, the project classifications were customized for our needs, the standard priorities low, normal, high, very high and maximum were adapted to our levels 1-4 and later 1-6. We also had our project management roles, such as steering committee or work package manager, mapped in the software. As a result, our colleagues also found their way around the software immediately.

Dario Britt
Head of Production | TechnoWood AG, Alt St. Johann, Switzerland

We use BSC for the scheduling of the complete project execution. This also includes the internal and external work in production and service. BCS is our tool for on-time production of our plants, so we can always give the customer meaningful and reliable deadlines.

  

Erfahrungen aus erster Hand:

Anwenderberichte von Unternehmen im Maschinenbau, die seit Jahren mit BCS erfolgreich sind

 

The advantages of BCS as software in mechanical engineering and plant construction

One gear meshes with the next: All information centrally available

To ensure that all components are available at the right time in tightly timed product development cycles in mechanical engineering, it is not only the internal organization that is crucial, but above all the complex network of relationships with a network of different suppliers and customers. With BCS, you make all information available centrally and up-to-date for all stakeholders by creating a perfect image of your internal organization and your external relationships and making any information available at the right place.

 You plan your projects in BCS according to your individual project management guidelines. BCS supports agile and hybrid methods in addition to classic project management standards (waterfall model, GPM/IPMA, PMI, V model PRINCE2). Once you have created a project, you can save it as a template and use it as a standard for future planning.
 You map your processes in BCS with integrated workflows and checklists or with the BPMN module for business process modeling. You can flexibly define and automate processes for all your project and business activities, for example complex inspection processes, production processes, invoice works, procurement and purchasing processes or even approval processes for vacation requests, etc. BCS informs each person responsible for a process step what they have to do and by when.
 You manage your customers, suppliers, service providers and contacts centrally with the CRM function of Projektron BCS. Once created, the communication history for each stakeholder is stored here, and contracts, offers, invoices, documents, data on joint projects and appointments are linked to the respective person or higher-level organization and made centrally accessible.
 Your internal organization is completely mirrored in BCS, both the organizational structure of your company with all locations and the project organization. Employee information is stored in digital personnel files with function, skills, areas of responsibility, departmental affiliation, working time model, payroll information and vacation management and made available for resource planning.
 Your assets, means of production, machines and other inventory items are also recorded in BCS, linked to associated contracts and documents and can thus be scheduled as material resources in projects.
 You centralize your communication with Projektron BCS. Every process is imported into BCS via mail import and CTI interface. With project tickets, you assign concrete tasks and collaborate across locations worldwide thanks to multi-language capability. The entire communication of ticket agents and representatives as well as the recording of working hours on tickets goes into the superordinate project. For planning your external project communication, the full functionalities of tasks, tickets, workflows with checklists and deadlines are available in BCS. This allows you to plan project communication as an integral part of the entire project right from the start. Via guest licenses, which can be flexibly defined by means of detailed rights assignment, you can include external stakeholders and offer them direct insight into the project progress or even grant them co-determination rights regarding certain views and aspects.
 You upload your documents directly to tasks or deadlines. Documents are stored in a uniform filing structure so that they can be found again. Authorized employees always have access to relevant information from anywhere. Team collaboration is facilitated because all members have access to the latest document version and changes are traceable. There are no more duplicates or outdated versions of documents. Search and filter functions facilitate knowledge transfer and research.
 Not only do you organize and manage your contracts in BCS, but you get a powerful tool for your entire contract lifecycle management (CLM). Link your contracts to people, organizations, tasks, workflows, project groups, projects, items in your inventory, offers, invoices or other contracts, or integrate them easily into work and approval processes. Use the integrated contract generator to create new contracts according to your individual requirements.
 BCS can meet your individual requirements for the scope of functions, mapping of your business logic and corporate language up to the corporate design by means of high-level customizing options.

Efficient communication processes and the immediate availability of all relevant information and materials are the keys to keeping development and production costs as low as possible in your mechanical engineering company and reliably meeting deadlines in your product development cycles. BCS is your central platform on which all this information flows together and is intelligently networked.

Nina Belau
Project Management Central Development | Viscom AG, Hannover

Personnel planning as well as hourly bookings have been completely transferred from Excel to BCS. Interfaces to our time recording/absence software and to our main ERP system are being planned. Thanks to BCS, we have managed to get a good overview for everyone involved in projects. Our requirements were implemented quickly and conscientiously by Projektron's support team.

Eva Klama
Project Management Office | Hörmann KG Antriebstechnik, Steinhagen

Due to the many parallel projects - we currently have about 40 projects running at the same time - and cross-departmental work, multi-project controlling in BCS plays a major role at Hörmann KG Antriebstechnik. Here the resources of all projects are monitored by BCS, free resources are distributed to the different projects in the best possible way.

By using BCS, the overview during the course of the project has been significantly increased. We can now make more qualified statements about when a project is likely to be completed. In addition, we are informed at an early stage about delays in the project process and their reasons. We can see exactly who is doing what and where additional staff is needed to relieve the workload.

Think and plan projects holistically

BCS supports you throughout the entire project lifecycle, regardless of the method or standard used. In addition to classic methods such as PRINCE2, GPM/IPMA or PMI and agile methods such as Scrum, BCS also offers all the tools, functions and wizards required to apply hybrid project management methods and industry-specific standards such as Automotive SPICE.

In plant engineering, where projects are often very extensive and complex because they involve many trades and technical disciplines, BCS supports you with high flexibility and maximum adaptability to map your individual project management requirements.

With the help of BCS you can get informative schedule and deployment plan overviews for research, development, investment projects in mechanical and plant engineering. BCS supports project managers in all phases of the project, from initiation and planning to controlling and closing. You can generate project proposals from ideas, compare them and use BCS' PPM tool to compile project portfolios on different focal points to decide which projects to implement.

BCS' multi-project controlling helps you keep track of all projects with their current status and resource utilization. With project-specific and cross-project evaluations, you can analyze not only planned and actual values, but also the remaining effort estimated by the individual project teams.

The project team documents all efforts continuously and directly on the project and makes them available for invoicing at any time.

Moving more together

With BCS, a project management software optimized for international use, your company's development or production teams in mechanical engineering or plant construction can work together efficiently regardless of their location. The software offers integrated collaboration tools and central access to projects and documents, enabling all project participants to connect on one platform. International collaboration is possible without barriers, as the system supports multiple languages and currencies. This means that your German location can work in German and bill in euros, while your development service provider in Budapest can use the Hungarian user interface and currency. Your supplier in China can even communicate in Chinese and bill in Chinese yuan, which is automatically converted by BCS. A total of ten different language versions are available in BCS.

Your employees can access BCS from anywhere via their browser. Not only your internal teams from different development and production locations, but also your customers and external project staff can be actively involved thanks to a suitable license structure and detailed rights management. Project participants with the appropriate rights can access the same central database regardless of their location and keep track of tasks, deadlines, and appointments.

Involving your customers creates transparency and keeps them informed about the current status of the project work as well as resources, expenses, and costs. Approval processes can be accelerated through direct communication via BCS, which leads to trust-based teamwork as well as time and cost savings and has a positive effect on everyone involved.

Dr. Simon Kimme
Head of Mechanical Engineering and Project Management | Laservorm GmbH, Altmittweida

Colleagues notice that BCS makes their work easier - that it helps them, for example, to be able to classify what role their work plays in the realization of an order by looking at the project plan. There is another point where BCS has helped us a lot: security and reliability in dealing with customers when negotiating realization times or changes at the customer's request within project realization.

Ticket system in BCS - Versatile for task assignment and external communication

The ticket system in BCS opens up several options at once:

 Customer communication and communication with external service providers and project participants.
 Internal task allocation and work organization within the scope of project tasks and line activities (Kanban board)
 Flexible task- and project-related effort recording for precise billing
 Exchange and documentation of communication within the scope of collaboration (also across locations)
 Change management via open items and tickets in which you escalate releases and changes directly to the steering committee.

Not only can you document your entire communication process on a ticket and attach documents required for processing a task, but you can also directly record the processing effort.

Franz Essl
IT Administrator | Best-Tech GmbH, Sierning, Austria

Looking back, we can say that choosing BCS was the right decision for our company. For us as a project-oriented technical service provider, BCS is the optimal tool to successfully implement demanding design and development projects for or together with our customers. Our internal activities and processes are optimally supported and our company's further growth is facilitated.

Quality and transparency

Quality management: Sources of errors dry up

BCS supports you in checking your quality management measures with a wide range of evaluation options. By using the ticket system from BCS, you can easily gain important information for your quality management, such as identifying frequent product defects.

Thought of everything? With standardized checklists, you map known error sources and support your employees in efficiently improving quality. Projects, tasks, workflow steps and milestones: In BCS, you benefit from the proven inspection method at numerous points.

Whether in tasks, workflows or projects - you can save your valuable experience quickly and easily in the appropriate comments fields for future work. The course of the project can be efficiently documented in BCS. This allows you to contribute to well-founded process analyses already during the project work and to promote continuous quality improvement.

Christian Schmelzing
Senior Manager Production and Assembly | ZF Friedrichshafen AG, Schweinfurt

We have strongly standardized the procedure for creating our offers and often work with our own project templates. Program managers create the master data as a project in request status and assign a project manager. The customer then receives an e-mail generated from BCS as a request confirmation. The project manager creates and sends a quote via BCS. When the customer orders the project, effort and structure planning begins with a fixed end date.

The project manager plans tasks and deadlines bottom-up and documents the progress in BCS during the project. Checklists help to comply with quality assurance requirements. After project completion, the findings flow into the templates as lessons learned and complete them with the effect of becoming increasingly error-proof.

Product management with BCS

In BCS, you organize your products in the "Products" workspace in a hierarchical structure of product structure elements. This hierarchy can be as deep as you like and is visualized by a graphical network diagram. Related products are shown by predecessor-successor relations and with hierarchies. You can also represent your own relations. A click on a product allows a detailed view, where the predecessor-successor relations are even more clearly visible.

Transparent performance: Reports

When working with external business partners, your mechanical engineering company benefits from the customizable reports you can create in BCS: A project preparation report, for example, creates a common project understanding, effort reports on projects and tickets increase transparency and secure the trust of your clients and customers.

Would you like reports that are precisely tailored to your company? Thanks to the interface to the open source report designer BIRT, you can design completely individual reports. You want to provide your customers with regular reports? You can create project status reports with statements on the current production status, the stability and quality of the project results, risk assessment and deviations from the original planning at the push of a button using the reporting function in BCS. You can do this efficiently using report orders with an integrated e-mail function: In the ergonomic wizard, you create all the required information on the report, output interval and recipient once, and BCS takes care of everything else for you automatically.

Runs like clockwork: Automate and optimize processes

With the BPMN process designer, BCS offers your company in plant engineering or mechanical engineering the possibility to model your individual production, sales and business processes. As an internationally recognized notation standard, BPMN is a central component of business process management and enables you to visualize and optimize your business processes and workflows. Furthermore, it creates more transparency about the processes within your company and towards potential customers.

BPMN processes enable you to assign tasks in a transparent and clearly defined manner in teamwork and in collaboration across departmental boundaries, hierarchical levels and locations.

Typical application cases and use cases for BPMN processes are:

 complex verification processes

 invoicing workflows

 procurement processes/purchasing processes

 approval processes with approval workflow (vacation request, request for business trip, home office, time off compensation, expense reimbursement, etc.)

The BPMN Designer enables the design, modeling, execution, monitoring, documentation, evaluation and optimization of processes within BCS. This supports business process management and automates the execution of frequently repeated business processes and workflows. Every employee has an immediate overview of exactly what they have to do, when and by when, and to which goal they are contributing.

  

License purchase or SaaS model - the choice is yours!

BCS is designed as a central tool that supports all important work processes in your mechanical engineering company from quotation to invoice - not just project work! BCS is individually scalable and adapts easily to your requirements thanks to versatile customizing options.

The structure of BCS is modular. This allows you to put together your individual ERP software for your mechanical engineering company module by module. You only pay for the functions that you really need and use. Your system remains updateable and flexible, so that you can map extensions quickly and easily.

You have the free choice between the on-premise and SaaS (cloud) variants of BCS. BCS has been developed by Projektron GmbH in Berlin since 2001. Thanks to continuous further development, you can expect a new release four times a year. As a German provider, we host your data in Germany according to the highest data protection and security standards.


Franz Essl
IT Administrator | Best-Tech GmbH, Sierning, Austria

BCS was able to convince us with its focus on projects, the best coverage of our requirements, the good price-performance ratio and the modern web interface. After the decision, we planned the implementation together with Projektron. Several joint workshops were held to define the configuration, specify necessary adjustments and plan the transfer of inventory data. Here, we had a competent and committed technical account manager from Projektron at our side, who helped us to set up BCS in the best possible way for our requirements. 

Dr. Simon Kimme
Head of Mechanical Engineering and Project Management | Laservorm GmbH, Altmittweida

We were particularly attracted by the fact that BCS is server-based and therefore does not have to be installed individually on each computer. The user works with the web browser he is familiar with. This makes the entire system user-friendly and independent of the operating system. As a growing company, we also liked the fact that BCS can be flexibly expanded through various licensing models. 

Christian Schmelzing
Senior Manager Production and Assembly | ZF Friedrichshafen AG, Schweinfurt

We were particularly impressed by the software's ergonomics, which we hoped would lead to high user acceptance, and the browser-based approach, thanks to which local installation at individual workstations is no longer necessary. The options for individual customizing also weighed heavily in our decision, because BCS allows us to map our own organization without having to make any compromises.

  

Discover BCS in a non-binding, personalized demo event and start your free trial period!

I would like to test BCS!

  


References: These mechanical engineering companies already rely on BCS

Were you impressed by the use cases and experiences of mechanical engineering companies with BCS?

Arrange your free demo presentation now and start your no-obligation trial period!