Business coordination software for the automotive industry

More drive in your projects – BCS as project management software for the automotive industry

New technological trends and drive technologies such as connectivity, sustainability, autonomous driving, decarbonization, mobility-as-a-service, and electrification are leading to profound changes in the automotive industry that affect all areas of production and the entire supplier industry. With BCS, you can plan and control diverse and demanding projects in the automotive environment in accordance with Automotive SPICE and other methods, and use the wide range of ERP functions to optimize your business processes. Projektron GmbH complies with the information security questionnaire of the German Association of the Automotive Industry (VDA ISA). The audit was carried out by the TISAX audit service provider TÜV SÜD Management Service GmbH.

I want to try BCS!
GetApp ReviewsGetApp BadgeTrusted Bewertung für BCS, sehr gutCapterra Reviews für BCSOMR Rating Widget für BCSOMR Badge für BCS

What if your project management software...

➤ flexibly adapts to your methods and PM guide?

➤ creates clear structures and clarity in complex multi-project management?

➤ enables you to react to resource bottlenecks at an early stage?

➤ actively supports you in scheduling and personnel resource planning?

➤ enabled you to make continuous process improvements?

➤ provides you with reliable target/actual analyses and real-time project data at the push of a button?

➤ centralizes your entire project communication on one platform? 

➤ manages all your employees, resources, inventory items, suppliers, and customers?

➤ made collaboration with your customers more transparent and effective? 

➤ lets you design your own controlling evaluations and reports?

➤ map the entire order process from quotation to invoicing?

➤ helps you to ensure your process and quality standards on a data basis?

Depending on the project and customer requirements, we develop according to the V-model, Scrum or a mixture of both. Without BCS as a powerful and open-method project management software, the current project flow would not be feasible. Internally, we also maintain a project management manual as a guideline for our project management activities. We have already been able to automate very many of the processes recorded there thanks to BCS.

Jörg Klenke
Management Board | PMO, BURGER ENGINEERING GmbH, Schwaig

Olrik Eichhorn
BCS Tool Responsibility | CARIAD SE

BCS enables us to efficiently link the work of our technical experts with the financial planning of our projects. To do this, BCS is connected to both our HANA cloud and our HR systems. This enables us to fully plan our resources and ensure that they are optimally utilized. BCS offers a high degree of data transparency and thus provides the basis for a wide range of evaluation options in our departments.

"For the development of our software products, we rely on agile project management according to Scrum. Since we also do classic project management in other areas, we were looking for a tool that helps us manage our projects and supports both approaches. We also wanted to link our customer data, including a ticket system for our customer support, to the projects. The simultaneous use of Projektron BCS for development and commercial processes offers us specific advantages for Model Engineering Solutions."

Dr. Hartmut Pohlheim
Managing Director, Model Engineering Solutions GmbH, Berlin

  

BCS - Project management software for the automotive industry

BCS has been developed in Germany since 2001, has won several awards as ERP System of the Year, and has also received the Process Solution Award. The awards not only recognized the diverse and open-method project management functions, but also the focus on process automation. BCS supports companies in the automotive industry in the digitalization and automation of internal and external business processes. Projektron GmbH follows the information security questionnaire of the German Association of the Automotive Industry (VDA ISA). The assessment was conducted by a TISAX audit provider.

Meeting deadlines, reducing costs, creating synergies, achieving project and company goals - with BCS in the automotive and automotive industry.

 

Open methods, flexible and adaptable

 

PRINCE2®, Waterfall, Scrum, Automotive SPICE®, V-Model etc

Supports hybrid project management methods

Mapping of your project management guideline and role concept

Fine-grained rights concept according to your organizational structure

Customizable: highly adaptable to your own requirements

Freely designable templates, Reports and evaluations

Individual dashboards with personal task overviews

Seamless integration into your existing software environment

Various interfaces (e.g. Jira, SAP, DATEV, Exchange)

 

Efficiency and quality: processes optimally supported

 

Freely definable workflows and processes according to BPMN 2.0

Quality assurance: Templates, checklists, quality gates

Processes and workflows for verification & validation of your products

Processes for planned, standard-compliant development execution

Quotation and invoice generator with dispatch directly from BCS

Document storage: store design data centrally and securely

Contract management and inventory management

CRM: contacts & communication (customers, suppliers, service prvd.)

Qualitative & quantitative evaluation measures for goals freely definable

 

Project management and resource planning: Achieving goals

 

Wizard-supported project planning according to various methods

Project planning according to the critical path method

Visual time and Resource planning in the interactive Gantt chart

Forward-looking resource and personnel planning

Project preparation with risk management and target definition

Multi-project- and portfolio management for full overview

Project controlling: graph. analyses, earned value analysis, forecasts

Vacation management: resource planning takes absence into account

Time recording: task, customer, project related recording of efforts

 

Ticket system - teamwork, task assignment, communication

 

Web-based software: location-independent collaboration

Worldwide collaboration (multi-language & multi-currency)

Reduces coordination and organization effort with external parties

Effort recording directly on the ticket with task & project assignment

Documented processing and communication history

Ticket view in Kanban board with drag-and-drop operation

Linkable with Scrum elementes: customer ticket becomes user story

Internal tickets: task allocation, change requests and much more

Guarantee service quality: Transparent service and response times

Would you like to learn more about BCS as software for the automotive industry?

Take part in our free demo presentation now and start your no-obligation trial!

I would like to test BCS!

  

Software Made in GermanyOMR 2026 Top RatedTÜV Rheinland ISO/IEC 27001, 27017, 27018TISAX Result availableSoftware Hosted in Germany 2026Projektron GmbH on Deutschland.Digital

  

Why is BCS the ideal software for the automotive industry?

Projektron BCS is the ERP and project management software for companies in the automotive industry, including automotive suppliers of all kinds:

Drive Technology Exterior equipment/design Sealing technology Electrics
Chassis Interior equipment/design Engines Vehicle construction (cars, trucks, buses, other commercial vehicles)
Control units Safety Bodywork Multimedia (navigation, consumer electronics, telecommunications)
Component supply      

What was important to those responsible for these companies in the automotive industry when selecting project management software, how do they use Projektron BCS effectively to improve their project management and business processes, and why do they continue to rely on the project management, ERP, and business coordination software to this day?

"If you are not only looking for a powerful project management tool, but also an integrated solution for a wide range of company departments and use cases, you are really in good hands with Projektron BCS. The holistic view in company processes and solutions is commendable, thus isolated solutions are avoided. This positive aspect is complemented by a high level of customizing."

Thomas Hackenbuchner
Head of Finance & Administration, MicroNova AG, Vierkirchen

We use BCS software throughout the entire project lifecycle, starting with the pre-project phase, followed by bidding and project processing, and ending with invoicing. In project processing, we use different tools in BCS depending on the project complexity. In any case, time or activity recording is a central component in every project. Therefore, we use BCS consistently in all our projects.

Franz Essl
IT Administrator, Best-Tech GmbH, Sierning, Austria

With BCS, we were able to make numerous processes relating to projects, resources, and time more efficient and transparent. This significantly reduced the effort required to meet the increasing documentation requirements in the automotive supply industry.

Marc Pötzsch
Head of Project Management/Quality Development, Eichsfelder Schraubenwerk GmbH

"Projektron BCS covers our wide spectrum. Since we have been implementing our project work with BCS, project management is perceived differently in our company. Scheduling, hourly billing, task assignment and team scheduling are just a few important functions that make working together more transparent. In the weekly project manager meeting, BCS has become the measure of all things."

Mirko Wittek
Senior Manager Business Applications and Processes, Leadec Automation & Engineering GmbH, Hoyerswerda

Thanks to the effort tracking, BCS is an excellent tool for our PMO to budget both external and internal tasks. It also gives an overview at any time of how much effort goes into which tasks. During the course of the project, employees regularly compare the actual and remaining effort with the planned effort. In this way, any need for action is identified at an early stage and those responsible can seek discussions with the customer to identify the causes of any additional effort and take appropriate countermeasures accordingly.

Jörg Klenke
Management Board | PMO, BURGER ENGINEERING GmbH, Schwaig

  

First-hand experience:

User reports from companies in the automotive industry that have been successful with BCS for years

 

The advantages of BCS as software in the automotive industry

All information centrally available

To ensure that all components are available at the right time in tight product development cycles in the automotive industry, it is not only the internal organization that is crucial, but also the complex network of relationships with various suppliers and customers. With Projektron BCS, you make all information available centrally and up-to-date for all stakeholders by creating a perfect image of your internal organization and your external relationships and making any information available at the right place.

  You plan your projects in Projektron BCS according to your individual project management guidelines. In addition to classic project management standards (waterfall model, GPM/IPMA, PMI, V-model PRINCE2), BCS supports agile and hybrid methods as well as industry-specific standards, including Automotive SPICE. Once you have created a project, you can save it as a template and use it as a standard for future planning.
  You can map your processes in BCS with integrated workflows and checklists or with the BPMN module for business process modeling. You can flexibly define and automate processes for all your project and business activities, for example complex inspection processes, production processes, invoice works, procurement and purchasing processes, or even approval processes for vacation requests, etc. BCS informs each person responsible for a process step what they have to do and by when.
 You manage your customers, suppliers, service providers and contacts centrally with the CRM function of Projektron BCS. Once created, your communication history for each stakeholder is stored here, and contracts, offers, invoices, documents, data on joint projects and appointments are linked to the respective person or higher-level organization and made centrally accessible.
  Your internal organization is completely mirrored in BCS, both the organizational structure of your company with all locations and the project organization. Employee information, including function, skills, areas of responsibility, departmental affiliation, working time model, payroll information and vacation management, is stored in digital personnel files and made available for resource planning.
  You also record your assets, means of production and inventory items in BCS, link them to associated contracts and documents and can thus schedule them as material resources in projects.
  You centralize your communication with Projektron BCS. Every process is imported into BCS via mail import and CTI interface. With project tickets, you assign concrete tasks and collaborate across locations worldwide thanks to multi-language capability. The entire communication of ticket agents and representatives as well as the recording of working hours on tickets goes into the superordinate project. For planning your external project communication, the full functionalities of tasks, tickets, workflows with checklists and deadlines are available in BCS. This allows you to plan project communication as an integral part of the entire project right from the start. Via guest licenses, which can be flexibly defined by means of detailed rights assignment, you can include external stakeholders and offer them direct insight into the project progress or even grant them co-determination rights regarding certain views and aspects.
  You upload your documents directly to tasks or deadlines. Documents are stored in a uniform filing structure so that they can be found again. Authorized employees always have access to relevant information from anywhere. Team collaboration is facilitated because all members have access to the latest document version and changes are traceable. There are no more duplicates or outdated versions of documents. Search and filter functions facilitate knowledge transfer and research.
  Not only do you organize and manage your contracts in BCS, but you get a powerful tool for your entire contract lifecycle management (CLM). Link your contracts to people, organizations, tasks, workflows, project groups, projects, items in your inventory, offers, invoices or other contracts, or integrate them easily into work and approval processes. Use the integrated contract generator to create new contracts according to your individual requirements.
  Projektron BCS can meet your individual requirements for the scope of functions, mapping of your business logic and corporate language through to corporate design by means of high-level customizing options.

Efficient communication processes and the immediate availability of all relevant information are the keys to keeping your development and production costs as low as possible and reliably meeting deadlines in your product development cycles. Projektron BCS is your central platform on which all this information flows together and is intelligently networked.

"We were particularly impressed by the software's ergonomics, which we hoped would lead to high user acceptance, and by the browser-based approach, thanks to which local installation at individual workstations is no longer necessary. The options for individual customizing also weighed heavily in our decision, because BCS allows us to map our own organization without having to make any compromises."

Christian Schmelzing
Senior Manager Production and Assembly, ZF Friedrichshafen AG, Schweinfurt

"Projektron BCS supports the standardized project processes at our company, for example in project planning in our product development. Particularly important to us are the automatic numbering and project name compilation as well as standardized templates. Among other things, this ensures quality in recurring projects. We also successfully rely on Projektron BCS in project portfolio management and budget and resource planning."

Normen Schlauer
Project Manager, Matzen & Timm GmbH, Norderstedt

Think and plan projects holistically

Projektron BCS supports you in all phases of the project lifecycle - no matter which method or standard you use to plan and implement your projects. In addition to classic methods such as PRINCE2, GPM/IPMA or PMI and agile methods such as Scrum, BCS also offers all the necessary tools, functions and wizards to apply hybrid project management methods and industry-specific standards such as Automotive SPICE. Thanks to its high flexibility and maximum customizability, you can also have appropriate configurations made to meet your own project management requirements. With BCS, you can thus map your individual project management guide.

With informative overviews of timelines and deployment plans, you can efficiently handle research and development projects as well as investment projects in the automotive industry in Projektron BCS. Projektron BCS supports project managers right from the initiation and planning of the project through to controlling and completion.

With the lean project portfolio management (PPM) of Projektron BCS, you generate project proposals from project ideas and compare them. With the PPM tool in Projektron BCS, you also compile portfolios for different focal points and decide which projects you actually want to implement.

In multi-project controlling, BCS helps you with the multi-project board to keep a constant eye on all projects with their current status and resource utilization. With Projektron BCS, managers have an overview of all the projects relevant to them, their most important key figures, and any missed deadlines. Thus, the cross-project evaluations not only show planned and actual values, but also the remaining effort estimated by the individual project teams.

All efforts are documented by the project team on an ongoing basis and directly on the project and are available for invoicing at any time.

Thanks to the effort tracking, BCS is an excellent tool for our PMO to budget both external and internal tasks. It also gives an overview at any time of how much effort goes into which tasks. During the course of the project, employees regularly compare the actual and remaining effort with the planned effort. In this way, any need for action is identified at an early stage and those responsible can seek discussions with the customer to identify the causes of any additional effort and take appropriate countermeasures accordingly.

Jörg Klenke
Management Board | PMO, BURGER ENGINEERING GmbH, Schwaig

Product management with BCS

You manage products in a hierarchical structure of product structure elements in the Products workspace in Projektron BCS. The hierarchical structure can be as deep as you like. The graphical network diagram in Projektron BCS provides an overview of related products, with blue arrows symbolizing a predecessor-successor relationship and gray arrows representing the hierarchy. In addition, it is possible to display your own relations. By clicking on a product, it can be viewed in more detail. The predecessor-successor relationship is displayed even more clearly.

"BCS supports us in every step of the product development process. From quotation costing to invoicing, as well as in our personnel management."

Karl Helmut Landgraf
Managing Partner, Best-Tech GmbH, Sierning, Österreich

Transparent performance: Reports

When collaborating with external stakeholders, your automotive company benefits from the customizable reports you can create in Projektron BCS: A project preparation report, for example, creates a common project understanding, while effort reports on projects and tickets increase transparency and ensure the trust of all project participants and stakeholders.

Want reports tailored exactly to your organization? Thanks to the interface to the open source report designer BIRT, you can design completely individual reports. Do you want to provide regular reports to different stakeholders? You can do this efficiently using report orders with an integrated e-mail function: In the ergonomic wizard, you create all the necessary information about the report, output interval and recipient once, and Projektron BCS takes care of everything else for you automatically.

"Projektron BCS covers our wide spectrum. Since we have been implementing our project work with BCS, project management is perceived differently in our company. Scheduling, hourly billing, task assignment and team scheduling are just a few important functions that make working together more transparent. In the weekly project manager meeting, BCS has become the measure of all things."

Mirko Wittek
Senior Manager Business Applications and Processes, Leadec Automation & Engineering GmbH, Hoyerswerda

Processes for more efficiency and quality

Runs by itself and always better: Automate and optimize processes

With the BPMN process designer, Projektron BCS offers your automotive company the possibility to model your individual sales processes, consulting processes and any other business processes. As an internationally recognized notation standard, BPMN is a central component of business process management and enables you to visualize and optimize your business processes and workflows. Furthermore, it creates more transparency within your company in the automotive industry and towards potential customers.

BPMN processes enable you to assign tasks in a transparent and clearly defined manner in teamwork and in collaboration across departmental boundaries, hierarchical levels and locations.

Typical application cases and use cases for BPMN processes are:

 complex verification processes

 invoicing workflows

 procurement processes/purchasing processes

 approval processes with approval workflow (vacation request, request for business trip, home office, time off compensation, expense reimbursement, etc.)

The BPMN Designer enables you not only to design and model processes within Projektron BCS, but also to execute, monitor, document, evaluate and optimize them. Projektron BCS thus supports your business process management and automates the execution of frequently repeated business processes and workflows. Every employee knows immediately when and by when they have to do exactly what and to which goal they are contributing.

"We have strongly standardized the procedure for creating our offers and often work with our own project templates. Program managers create the master data as a project in request status and assign a project manager. The customer then receives an e-mail generated from BCS as a request confirmation. The project manager creates and sends a quote via BCS. When the customer orders the project, effort and structure planning begins with a fixed end date.

The project manager plans tasks and deadlines bottom-up and documents the progress in BCS during the project. Checklists help to comply with quality assurance requirements. After project completion, the findings flow into the templates as lessons learned and complete them with the effect of becoming increasingly error-proof."

Christian Schmelzing
Senior Manager Production and Assembly, ZF Friedrichshafen AG, Schweinfurt

Quality management: sources of error dry up

Projektron BCS supports you in checking your quality management measures with a wide range of evaluation options. If you use the ticket system from Projektron BCS, you can easily gain important information for your quality management - for example, about frequent product errors.

Thought of everything? With standardized checklists, you map known error sources and support your employees in efficiently improving quality. Projects, tasks, workflow steps and milestones: In Projektron BCS, you benefit from the proven testing method at numerous points.

Whether in tasks, workflows or projects - you can save your valuable experience quickly and easily in the appropriate comments fields for future work. The course of the project can be efficiently documented in Projektron BCS. This allows you to contribute to well-founded process analyses already during the project work and to promote continuous quality improvement.

"BCS also supports MicroNova in the processes around quality and information security management. In the former area, the company uses BCS to determine quality metrics through the use of raw data. These include compliance with process specifications, budgets and deadlines as well as measuring customer satisfaction, as well as obtaining defined quality gates."

Thomas Hackenbuchner
Head of Finance & Administration, MicroNova AG, Vierkirchen

Collabortion without limits

With Projektron BCS ERP and project management software, your development or production teams at different locations can work together efficiently. Thanks to integrated collaboration tools and central access to projects and documents, you can bring all project participants together on one platform. Projektron BCS is also ideally equipped for international collaboration. The system supports multiple languages and currencies, so your German location can work in German and bill in euros, while your development service provider in Budapest can use the Hungarian user interface and Hungarian currency. Even your supplier in China can communicate in Chinese and bill in Chinese yuan, which BCS automatically converts. A total of ten different language versions are available in Projektron BCS.

Your employees can easily access Projektron BCS from anywhere via a browser. But it's not just your internal teams; your customers and external project staff can also be actively involved thanks to a suitable license structure and detailed rights management. Project participants with the appropriate rights can access the same central database regardless of their location and keep track of tasks, deadlines, and appointments.

By involving your customers, you create transparency. Your customers are not only informed about the current status of the project work, but also about resources, expenses, and costs. Approval processes can be accelerated through direct communication via BCS. Trust-based teamwork and time and cost savings have a positive effect on everyone involved.

Not only during project execution and for internal project controlling BCS provides more transparency, but already during the planning phase towards the customer: Even the first rough planning can be shared with the customer via BCS. In this way, the entire procedure and also the estimated efforts and budgets become more comprehensible for our customers. If a customer also wants regular insight into the status of project progress and bookings during project implementation, this is no problem at all. Particularly with regard to this transparency towards the customer, I can expressly recommend Projektron BCS to other companies in our industry for project management.

Jörg Klenke
Management Board | PMO, BURGER ENGINEERING GmbH, Schwaig

Looking back, we can say that choosing BCS was the right decision for our company. For us as a project-oriented technical service provider, BCS is the optimal tool to successfully implement demanding design and development projects for or together with our customers. Our internal activities and processes are optimally supported and our company's further growth is facilitated.

Franz Essl
IT Administrator, Best-Tech GmbH, Sierning, Austria

Ticket system in BCS - Versatile for task assignment and external communication

The ticket system in Projektron BCS opens up several options at once:

 Customer communication and communication with external service providers and project participants.
 Internal task allocation and work organization within the scope of project tasks and line activities (Kanban board)
 Flexible task- and project-related effort recording for precise billing
 Exchange and documentation of communication within the scope of collaboration (also across locations)
 Change management via open items and tickets in which you escalate releases and changes directly to the steering committee.

On a ticket, you can not only document their entire communication process and attach documents necessary for processing a task, but also directly record the processing effort.

Tickets for Scrum

If you work with the ticket system from Projektron BCS, you can easily transfer internal inquiries and customer requests for your products into your Scrum projects.

For example, if a customer requests a new function via ticket, you can create the associated user story in the Scrum software with just a few clicks and add it to a product backlog. The ticket description can be easily adopted for user stories and activities. Projektron BCS links the new user story to the original ticket, making it easy to trace the background of its creation, for example when prioritizing the product backlog.

In addition, tickets can be linked to existing user stories, epics or partial requirements.

"Initially, we introduced Projektron BCS in July 2012 with a focus on software development according to Scrum. We focused on a pilot project and were advised by Projektron support on the initial setup of a Scrum project. In the role of the product owner, one is supported by an intuitive wizard when planning the sprints, such as team planning, effort distribution and setting meetings. The product backlog in BCS allows us to manage and prioritize the epics, user stories and acceptance tests in a very clear and structured way. This means that the current project status can be viewed centrally and transparently and forms the basis for discussions with stakeholders as well as estimation meetings with the team."

Dr. Hartmut Pohlheim
Managing Director, Model Engineering Solutions GmbH, Berlin

TISAX® result: highest safety standards

The ENX Association supports with TISAX (Trusted Information Security Assessment Exchange) on behalf of VDA the common acceptance of Information Security Assessments in the automotive industry. The TISAX Assessments are conducted by accredited audit providers that demonstrate their qualification at regular intervals. TISAX and TISAX results are not intended for general public.

For Projektron GmbH confidentiality, availability and integrity of information have great value. We have taken extensive measures on protection of sensitive and confidential information. Therefore, we follow the question catalogue of information security of the German Association of the Automotive Industry (VDA ISA). The Assessment was conducted by an audit provider, in this case the TISAX audit provider TÜV SÜD Management Service GmbH. The result is exclusively retrievable over the ENX Portal.

  

BCS in a license purchase or SaaS model - the choice is yours!

BCS is the central tool for your automotive company that supports all important work processes from offer to invoice. BCS is not only focused on pure project work, but is optimized as business coordination software for the development and optimization of your entire business processes. BCS is individually scalable and can be easily adapted to your requirements thanks to versatile customizing options.

The modular structure of BCS allows you to put together your individual ERP system for your company in the automotive industry step by step. You only pay for the functions that you really need and use. Your system always remains updateable and flexible, so that you can map expansions quickly and easily.

You have the free choice between the on-premise and der SaaS (Cloud) variants of BCS. BCS  has been developed by Projektron GmbH in Berlin since 2001. With four new releases per year, you will always be up to date. As a German provider, we host your data in Germany according to the highest data protection and security standards. Start now with BCS in automotive and automotive industry and achieve your project and business goals around car, vehicle and single component!


BCS was able to convince us with its focus on projects, the best coverage of our requirements, the good price-performance ratio and the modern web interface. After the decision, we planned the implementation together with Projektron. Several joint workshops were held to define the configuration, specify necessary adjustments and plan the transfer of inventory data. Here, we had a competent and committed technical account manager from Projektron at our side, who helped us to set up BCS in the best possible way for our requirements.

Franz Essl
IT Administrator, Best-Tech GmbH, Sierning, Austria

In the BIRT report designer, our project management team - after appropriate training by Projektron - also designed its own project profile and project status report. Furthermore, BURGER ENGINEERING has had additional controlling evaluations programmed by Projektron - for evaluating the rate of paid hours of our employees. In addition, our project management team has created various checklists for the area of occupational safety as well as for the various quality gates in the projects.

Jörg Klenke
Management Board | PMO, BURGER ENGINEERING GmbH, Schwaig

"Before deciding on project management software, we compared various solutions. Projektron BCS proved to be the one that best met our requirements - and offered a very attractive price-performance ratio."

Dr. Sven Kleiner
Management Board, :em engineering methods AG, Darmstadt

  

Discover BCS in a non-binding, personalized demo and start your free trial period!

I would like to test BCS!

  


Referenzen: Diese Unternehmen aus der Automobilindustrie und Zulieferer setzen bereits auf BCS

Were you impressed by the use cases and experiences of companies in the automotive industry and automotive suppliers with BCS?

Arrange your free demo presentation now and start your no-obligation trial period!

I would like to test BCS!

Learn more about software selection and software implementation